Main Content
DKFN letter to MVEIRB - February 15 2008
(51.09 KB)
Response from the MVEIRB to David Swisher of Tamerlane Ventures Ltd.'s letter of February 7, 2008.
MVEIRB's letter of response to Chief Alec Sunrise's letter of February 7, 2008.
KFN letter to MVEIRB
(91.43 KB)
Letter from Tamerlane Ventures to MVEIRB
(32.67 KB)
Final Comments from the FRMC
(142.67 KB)
EA Update - Nov 2, 2007
(59.93 KB)
EA Update Oct 31
(67.48 KB)
Copy of Mine Site Reclamation Policy for the NWT
(341.24 KB)
Project update october 5 2007
(106 KB)
Comments from Jesse Jasper of Environment Canada, identifying historic documentation by the NWT Water Board on Cominco's Pine Point mine's impact on surface vegetation and groundwater.
Notice that the Review Board has conferred party status to the Deninoo Community Council of Fort Resolution.
Report of Q and A between Tamerlane and GNWT DOT
(345.89 KB)
Katlodeeche First Nation Party Status
(27.66 KB)
Correspondence between the Katlodeeche First Nation and the federal minister relating to concerns from the KFN about EA timelines.
Evaluation of Deep Well Disposal
(78.52 KB)
Comments from Deh Cho First Nations
(56.6 KB)
Letter is an evaluation from an expert consultant regarding the potential for use of explosives in the mining of the R-190 deposit to lead to release of ammonia and nitrate. This is submitted as response to an undertaking from the technical sessions.
A letter from the developer in response to questions posed by ENR regarding types of oil heaters used, planned hazardous waste disposal and revegetation schemes. The original email from ENR is included as the last pages of this document.
Responses, relayed by the developer, from Layne Christensen, the main contractor on the freezewall technology, with regard to the freeze connections, brine and spill contingencies.
Topographic Map of R 190 site from Tamerlane
(711.1 KB)
Schedule for Freeze Wall and Shaft Freezing.
(96.04 KB)
Drill logs for holes near the infiltration basin and some near the R190 deposit. This was designed to show consistency in the overburden depths between the two. Attachment 1 show the numbered locations of drill holes on a map; Attachment 2 has drill logs
Data on Water Discharge Levels
(677.35 KB)
After further investigation Tamerlane has committed to using injection wells.
An update from Tamerlane Ventures identifying changes to the power source plans for the PPPP, as of July 12, 2007, indicating a transition to hydro power from the Taltson Dam during the course of operations. Also included is correspondence between the dev
Correspondence between Tamerlane Ventures and Environment Canada concerning water treatment plant proposed for the processing facility and the concentrate facility. Specifications of the proposed water treatment facility are included, although information
Meeting notes from videoconference discussion between the developer, INAC, GNWT and Environment Canada, on July 5, 2007. Discussed was air quality, species at risk, and closure and reclamation.
Forwarded to MVEIRB by INAC to follow up on response to IR #32, this document released in 1997 and written by Caroline Lafontaine, details research findings on "concentrations of metals and trace elements in muscle and liver of fish collected from Great S
EA update june 22 2007
(60.29 KB)
Notification of Party Status
(40.24 KB)
letter of support from DKFN
(87.42 KB)
Letter of support from Hay River North MLA
(71.93 KB)
Hay River Metis letter of support for PPPP
(44.16 KB)
June 4 2007 EA update
(59.8 KB)
A letter of support for the PPPP from Hay River South MLA Jane Groenewegen, dated May 29, 2007.
Report on Site Visit of May 23, 2007.
(135.61 KB)
Email correspondence between the MVEIRB and Mr. Greg McMeekin of Hay River.
This is a notice that the Review Board has retained a team of expert advisors
On May 9, 2007, the Review Board issued Request for Party Status forms to the distribution list for the Pine Point Pilot Project EA, along with an explanatory letter. Forms are due back by June 1, 2007.
Notice of site visit may 23 2007
(34.29 KB)
PPPP EA update - April 19, 2007
(106.5 KB)
A letter of support for the Tamerlane PPPP, received by the Review Board on April 18, 2007, from Chief Alec Sunrise of the Katlodeeche First Nation.
Email from Greg McMeekin - Feb 25 2007
(54.14 KB)
DKFN Press Release - March 2007
(109.37 KB)
EA0607-002 Project Update March 9 2007
(11.58 KB)
A letter received by MVEIRB on February 24, from R. Swanson, expressing support for the proposed development.
Minerals of the Pine Point lead-zinc deposits
(505.77 KB)
Copy of an email from Greg McMeekin of Hay River and response from MVEIRB, relating to concerns about Tamerlane's proposed development. Mr. McKeekin also refers to a web document available at http://www.encyclopedia.com/doc/1G1-141579014.html in his corre
Letter of response from the MVEIRB to the Town of Hay River's letter relaying concerns about the information required of the developer in the Developer's Assessment Report. Issued February 16, 2007.
2006 NWT Mine Reclamation Guidelines
(333.26 KB)
A report by geological consultants G.H. Giroux and Ian McCartney on the geology of the Pine Point area, as well as some discussion of previous mining. 42 pages
NHRI 1998 study of metals in Resolution Bay
(16.04 KB)
Due to copyright concerns, news media items will no longer be included on the public registry website. 3 items have been removed, and instructions in the attached file indicate how the Review Board will be treating future news items.
Letter comments on the importance of community based traditional knowledge.
Involvement of NRCAN in Tamerlane EA
(25.47 KB)