Main Content
Developer's Response to IR#55
(7.92 MB)
IR#55 - cover material
(108.72 KB)
IR55 - Draft Commitments Table
(967.21 KB)
Additional information from the developer on basal inflows to the mine, as required in IR46 submitted by INAC.
Supplemental response to second round IR 37, detailing the flood risk level associated with the ore loadout facility, and mitigations in construction of the facility to prevent flooding.
Supplemental response to IR47
(333.18 KB)
Response, received on September 11, 2007, of IR42 from Indian and Northern Affairs Canada. Their response addresses what provisions in current reclamation bonding protects the people of the Mackenzie Valley from environmental and financial costs associate
Supplemental response to IR49
(2.37 MB)
Tamerlane Response to IRs 35 and 38
(1.17 MB)
DKFN questions about Injection wells
(74.77 KB)
Article 4 of 4 on boom bust effects
(3.57 MB)
Article 3 of 4 on boom bust effects
(189.99 KB)
Article 2 of 4 on boom bust effects
(2.91 MB)
Article 1 of 4 on boom bust effects -
(1.29 MB)
Second Round IR responses received from Tamerlane Ventures on August 15, 2007. Responses to IR # 35 and #38 are not included, and some other IRs cite forthcoming information. The Review Board has requested better quality map images to accompany this infor
Second Round of IR's
(147.23 KB)
Letter of August 9, 2007 from the FRMC to the Review Board identifying two general areas of concern that they feel merit further study: Woodland Caribou and impacts of mining on water and aquatic life in the Great Slave Lake near the proposed project.
correspondence from Environment Canada and the GNWT related to their opinion on the need for site specific air quality assessment
Proposed 2nd Round IRs from GNWT
(103.29 KB)
INAC proposed 2nd round IRs
(239.17 KB)
Comments received by the Review Board on August 7, 2007, from Environment Canada, stating a need for IRs on air quality issues, and making comments on the need for public hearings versus written submissions.
Notification of the Review Boards reconsideration of need for Public Hearing and issuance of 2nd round of IR's.
A list of concerns arising from the Fort Resolution Metis Council's analysis of the PPPP Developer's Assessment Report. Issues related to freezewall and water will likely be discussed during the forthcoming Technical Sessions; for other issues (SARA speci
Tamerlane Additional info on IR 19 response
(324.15 KB)
INAC response to first round IR 32
(641.1 KB)
GNWT response to IR 34
(44.09 KB)
Tamerlane Ventures Inc.ƒ_Ts response to the first round of of Information Requests
Response to First Round IR #33 by Environment Canada, in which the Metal Mining Effluent Regulations are not considered to apply to the PPPP.
First Round Information Requests
(1001.36 KB)