DIAND comments following scoping sessions
(256.58 KB)
NWTMN post-scoping sessions comments
(40.3 KB)
List of available files on Pine Point area available at CS Lord; sent from Tamerlane to MVEIRB on August 22, 2006.
Comments and questions for the EA received from Kara King of Fort Resolution on August 18, 2006.
A Report by GTC Geologic Testing Consultants to Environment Canada on the Pine Point area, submitted March 30, 1983. Sent from Tamerlane Ventures to MVEIRB on August 22, 2006.
Environmental Evaluation submitted to Western Mines Limited in June 1980 on Great Slave Reef project (including R-190 property. Submitted by Tamerlane to MVEIRB on August 22, 2006.
updated community engagement log
(302.5 KB)
Sent from DKFN to MVEIRB on August 24, 2006
EA0607-002 update - september 6 2006
(64.58 KB)
Final meeting report from MVEIRB of August 16, 2006 scoping session held at the Chief Lamalice Complex on the Hay River Reserve.
Final Meeting Report from MVEIRB of the Fort Resolution Scoping Session held on August 17, 2006.
Presentation given by MVEIRB on process of EA and purpose and goals of scoping sessions, August 16 and 17.
DKFN scoping submission
(1.52 MB)
Tamerlane Scoping Sessions Presentation
(4.56 MB)
Post-scoping Session information
(64.03 KB)
Response from EC to MVEIRB re: notification of Section 79(1) that Species at Risk may have habitat within the area impacted by Tamerlane's Pine Point Project.
Tamerlane Pine Point EA update - August 3 2006
(948.45 KB)
maps to scoping sessions
(446.74 KB)
Response from Tamerlane to GNWT re: stated concerns from preliminary screening of Pine Point Project.
Response to issues raised during preliminary screening by Wayne Starling of INAC, including attachments.
Agendas for the scoping sessions on August 16 in Hay River and August 17 in Fort Resolution, along with some guidance from the Review Board to parties on how to prepare for the Scoping Sessions. NOTE: DATE ON DOCUMENT OF JULY 2 IS IN ERROR. DATE SHOULD BE
final minutes of a July 12th meeting between the developer, INAC, Environment Canada and GNWT departments to discuss issues brought up during preliminary screening.
Tamerlane invitation to site visit
(295.24 KB)
Background article from 1976 submitted by Tamerlane
background article from 1969 submitted by Tamerlane
Research report by Brown, Erdman and Associates for Westmin Resources on the R-190 deposit, dated April 1982. cited by Tamerlane in correspondence to NWTMN dated July 21, 2006. NOTE: THIS IS A 3.6 MB FILE, 170 PAGES, AND MAY TAKE SOME TIME TO DOWNLOAD.
Tests on hydrogeology of R-190 deposit area by Stevenson International undertaken in 1983 for Westmin Resources. cited by Tamerlane in response to NWTMN dated July 21, 2006. NOTE: THIS IS A 8.6 MB FILE, 109 PAGES LONG, AND MAY TAKE SOME TIME TO DOWNLOAD.
Tamerlane to NWTMN - re concerns
(1.9 MB)
The MVEIRB is announcing the holding of Scoping Sessions in Hay River (August 16) and Fort Resolution (August 17).
Response to Natural Resources Canada survey on explosives proposed for use at Tamerlane's Pine Point Project.
A presentation and attachments given by Tamerlane to INAC and EC regarding specific technical concerns expressed during Preliminary Screening.
An email from Tamerlane to MVEIRB with attachment discussing additional testing being done on Dense Media Separation circuit proposed for Pine Point Project.
HRMC letter to Tamerlane - July 14 2006
(173.86 KB)
Email and questionnaire from NRCAN to Tamerlane requesting additional information about any explosives to be used in the Pine Point Pilot Project.