Main Content
Letter regards the schedule for the conformity check and technical analysis of the CZN surface drilling program environmental assessment.
Letter regards the schedule for the conformity check and technical analysis of the CZN surface drilling program environmental assessment.
Conformity and Technical Review
(68.99 KB)
Conformity and Technical Review
(68.99 KB)
Equivalent to the Developer's Assessment Report
Equivalent to the Developer's Assessment Report
Email fom Can Zinc to MVEIRB
(19.82 KB)
Email fom Can Zinc to MVEIRB
(19.82 KB)