Main Content
Onglets principaux
Results
Displaying 7876 - 7900 of 12191
Screech Lake - EA0607-003 Go to Project
Environmental Assessment (EA) - Complete
WWF screening submission
(24.5 Ko)
WWF EA0506-003 submission
(357.78 Ko)
Treaty 8 submission EA0506-003
(625.42 Ko)
Thelon Game Sanctuary Management Plan
(307.81 Ko)
Thelon A River Sanctuary
(451.32 Ko)
Referral and screening report MV2005C0007
(877.76 Ko)
Submission by developer to previous (cancelled) assessment EA0506-003 of the proposed development. Summary description of uranium exploration.
LUP Application MV2005C0007
(719.98 Ko)
Joan Pelly EA0506-003 submission
(35.29 Ko)
David Pelly EA0506-003 submission
(33.5 Ko)
Submission from Canoe Arctic to previous (cancelled) assessment EA0506-003 of the proposed development.
SDL 8 2-D Geophysical Program - EA0506-007 Go to Project
Environmental Assessment (EA) - Complete
Response by KTFN to Paramount Request for Ruling
(266.57 Ko)
A submission by Indian and Northern Affairs Canada regarding Paramount Resources Ltd's Request for Ruling
DCLUP response to Request for Ruling
(46.67 Ko)
Technical Report from Paramount Resources Ltd.
(114.94 Ko)
Paramount Request for Ruling
(111.62 Ko)
Technical Report from GNWT-ENR
(172.05 Ko)
Technical Report from Environment Canada
(114.09 Ko)
Technical Report from KTFN on SDL8 EA
(127.3 Ko)
Pine Point Pilot Project - EA0607-002 Go to Project
Environmental Assessment (EA) - Complete
Deninu Kue First Nation comments on draft ToR
(286.84 Ko)
Comments on draft ToR from GNWT-ENR
(121.08 Ko)
The Review Board's response to the Northwest Territory Metis Nations request to extend the draft ToR comment period. The Review Board has decided to stay with its current time lines.
Town of Hay River comments of draft ToR
(45.15 Ko)
A letter, dated Sept 21, 2006, from Cece Heron, Northwest Territory Metis Nation, requesting an extension of the comment peridd for the draft Terms of Reference.
Dehcho Geotechnical Survey - EA03-009 Go to Project
Environmental Assessment (EA) - Complete
MVEIRB letter to Minister Prentice expressing concerns over the length of time and the process for the "Consult to Modify" and decision-making process on the EA.