Main Content
Onglets principaux
Results
Displaying 7776 - 7800 of 12191
Pine Point Pilot Project - EA0607-002 Go to Project
Environmental Assessment (EA) - Complete
DAR Appendix C - Feasibility study
(780.51 Ko)
DAR Appendix C - Groundwater flow evaluation
(299.2 Ko)
DAR Appendix D - GNWT community statistics 2006
(398.08 Ko)
DAR Appendix F - Hazardous materials plan
(97.83 Ko)
DAR Appendix F - Material Safety Data Sheets
(125.12 Ko)
Developer's Assessment Report
(29.54 Mo)
Screech Lake - EA0607-003 Go to Project
Environmental Assessment (EA) - Complete
Jim Storey submission
(11.46 Ko)
Draft Hearing Agenda
(28.96 Ko)
Clarification-LKDFN Response to IR's-Jan07
(11.94 Ko)
Athabaska Denesuline submission to EA0506-003
(292.69 Ko)
Athabaska Denesuline maps
(501.94 Ko)
Response to Denesuline request for Party status
(169.01 Ko)
IR0607-003-2 INAC Response
(129.87 Ko)
Denesuline request for Party status
(137.47 Ko)
LKDFN Response to IR's-Dec06
(34.66 Ko)
SDL 8 2-D Geophysical Program - EA0506-007 Go to Project
Environmental Assessment (EA) - Complete
This letter is in response to a December 21, 2006 letter Paramount Resources sent to the Review Board.
A letter from Bob Overvold to Gabrielle Mackenzie-Scott, thanking MVEIRB for providing the Report of the Environmental Assessment
This letter outlines Paramount's response and opinion on the Report of Environmental Assessment issued by MVEIRB.
Mineral Exploration Program - EA0506-005 Go to Project
Environmental Assessment (EA) - Cancelled
Letter from MVEIRB re: Request for Ruling
(46.48 Ko)
Letter gives new dates for the prehearing conference, technical session and community hearing for the Consolidated Goldwin & Sidon Environmental Assessments.
YKDFN IR responses
(843.1 Ko)
This letter conveys the YKDFN's opinion that a hearing is necessary for the environmental assessments of Consolidated Goldwin & Sidon's proposed exploration programs.
Mineral Exploration Program - EA0506-006 Go to Project
Environmental Assessment (EA) - Cancelled
Letter from MVEIRB re: Request for Ruling
(46.48 Ko)
Letter gives new dates for the prehearing conference, technical session and community hearing for the Consolidated Goldwin & Sidon Environmental Assessments.
YKDFN responses to IRs
(843.1 Ko)