Main Content
Onglets principaux
Results
Displaying 3301 - 3325 of 12191
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
This letter provides information on the Jan. 20th 2014 working meeting, which is part of the consult-to-modify process for the Giant EA. It includes an agenda.
This letter describes the consult-to-modify process to consider modifications to certain measures from the Report of EA.
This is a letter from NPMO to the Tlicho Government requesting comments on proposed modifications to the Review Board's measures from the Giant Report of EA
This is a letter from NPMO to the NSMA requesting comments on proposed modifications to the Review Board's measures from the Giant Report of EA
This is a letter from NPMO to the YKDFN requesting comments on proposed modifications to the Review Board's measures from the Giant Report of EA
This is a letter from the Minister of Aboriginal Affairs and Northern Development Canada to the Mackenzie Valley Review Board initiating consultation to proposed modification of 9 measures.
Mackenzie Valley Highway - EA1213-02 Go to Project
Environmental Assessment (EA) - Ongoing
GNWT letter of receipt of the final TOR
(28.89 Ko)
This is the final Terms of Reference for the Mackenzie Valley Highway assessment.
draft interim Work Plan
(272.38 Ko)
This is the cover letter for the final Terms of Reference and interim draft Work Plan
Jay Project - EA1314-01 Go to Project
Environmental Assessment (EA) - Complete
This document is titled "Scenario Analysis, Best practices in assessing cumulative effects from the MGP" and is submitted by AANDC as a follow-up to the Jan 8 technical meeting.
"Strategic approaches to regional cumulative effects assessmet: a case study of the Great Sand Hills, Canada, Noble, 2008" submitted during technical scoping meeting Jan 8, 2014. Canada
This is an example of potential Future Development Senarios prepared by Conoco Phillips. Recemmended for the registry from Jan 8 Technical Meeting.
DDEC Scoping session presentation
(4.3 Mo)
Comments summary table - DDEC draft ToR
(226.55 Ko)
Technical scoping session agenda
(60.43 Ko)
Summary table - comments on draft DDEC ToR
(260.52 Ko)
This is the agenda for the community issues scoping session for the Jay-Cardinal Project to be held in Yellowknife at the Tree of Peace on January 7, 2014.
EC comments on DDEC draft ToR
(290.69 Ko)
Federal department comments on DDEC draft ToR
(180.25 Ko)
GNWT comments on DDEC ToR
(148.95 Ko)
YKDFN comments on DDEC ToR
(169.05 Ko)
DDEC engagement session summaries Aug/Nov 2013
(513.96 Ko)
IEMA comments on DDEC draft TOR
(236.85 Ko)
Snap Lake water licence amendment - EA1314-02 Go to Project
Environmental Assessment (EA) - Complete
TDS Response Plan
(26.83 Mo)