Main Content
Onglets principaux
Results
Displaying 3251 - 3275 of 12131
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
This letter describes the consult-to-modify process to consider modifications to certain measures from the Report of EA.
This is a letter from NPMO to the Tlicho Government requesting comments on proposed modifications to the Review Board's measures from the Giant Report of EA
This is a letter from NPMO to the NSMA requesting comments on proposed modifications to the Review Board's measures from the Giant Report of EA
This is a letter from NPMO to the YKDFN requesting comments on proposed modifications to the Review Board's measures from the Giant Report of EA
This is a letter from the Minister of Aboriginal Affairs and Northern Development Canada to the Mackenzie Valley Review Board initiating consultation to proposed modification of 9 measures.
Mackenzie Valley Highway - EA1213-02 Go to Project
Environmental Assessment (EA) - Ongoing
This is the final Terms of Reference for the Mackenzie Valley Highway assessment.
draft interim Work Plan
(272.38 Ko)
This is the cover letter for the final Terms of Reference and interim draft Work Plan
Letter C Snowshoe to MVEIRB
(45.65 Ko)
The Government of Canada's consolidated comments on the draft ToR
A cover letter accompanying the NPMO consolidated comments on the draft ToR
GNWT Comments on Draft MVH ToR
(117.9 Ko)
A cover letter accompnaying the GNWT response to the draft ToR
Jay Project - EA1314-01 Go to Project
Environmental Assessment (EA) - Complete
EC comments on DDEC draft ToR
(290.69 Ko)
Federal department comments on DDEC draft ToR
(180.25 Ko)
GNWT comments on DDEC ToR
(148.95 Ko)
YKDFN comments on DDEC ToR
(169.05 Ko)
DDEC engagement session summaries Aug/Nov 2013
(513.96 Ko)
IEMA comments on DDEC draft TOR
(236.85 Ko)
Notification letter to NIRB
(315.12 Ko)
This is a notification from the Review Board of community scoping sesions and a technical scoping session scheduled for January 2014.
This is an Excel template to be used for comments and recommendations on the Review Board's proposed Terms of Reference. It can also be found on the WLWB's Online Review System.
Request for comments on developer's proposed ToR
(474.48 Ko)
Letter from EC re SARA notification
(736.01 Ko)
Snap Lake water licence amendment - EA1314-02 Go to Project
Environmental Assessment (EA) - Complete
TDS Response Plan
(26.83 Mo)