Main Content
Onglets principaux
Results
Displaying 11576 - 11600 of 12191
Underground Decline and Pilot Plant - EA01-002 Go to Project
Environmental Assessment (EA) - Complete
Letter from NNPR to MVEIRB re: EA Report
(10.5 Ko)
Letter supports the idea that MVEIRB conduct the Conformity Analyses between the Environmental Assessment Report produced by Canadian Zinc and the Terms of Reference produced by MVEIRB.
Letter provides MVEIRB's decision on the conformity of the Environmental Assessment Report submitted by Canadian Zinc to the Terms of Reference.
Letter from CZN to MVEIRB re: EA work plan
(76.18 Ko)
Letter concerning Canadian Zinc's previously submitted Environmental Assessment Report. Also Includes Milestone Completion Timetable for EA 01-002 and EA 01-003.
Letter thanks developer for Environmental Assessment Report and states that the timelines of 01-002 and 01-003 timelines are being brought together to overcome some time restraints.
Letter from INAC to MVEIRB re: timeline
(81.75 Ko)
Includes: Cover letter, EA report, Safety & Procedures Manual, Land Overlaps Map, Location Map, Claims Map, Pilot Plant Flowsheet, Pilot Plant Location Drawing, Site Plan and Metallurgical Studies Bibliography.
Cameron Hills Exploratory Drilling Project - EA00-004 Go to Project
Environmental Assessment (EA) - Complete
Cameron Hills Drilling Project - August 2001
(16.04 Ko)
Snap Lake Diamond Mine - EA01-004 Go to Project
Environmental Assessment (EA) - Complete
Email regards WWF involvment in the EA of De Beers Canada Snap Lake Diamond Project.
Distribution List
(188.62 Ko)
Letter identifies the MVLWB as a regulatory authority in the EA of DeBeers' proposed Snap Lake diamond project, Akaitcho region.
Letter identifies the YKDFN as an intervener in the assessment of DeBeers' proposed Snap Lake diamond mine, Akaitcho region.
CanTung Mine Water License Renewal - EA02-003 Go to Project
Environmental Assessment (EA) - Cancelled
Web article re: NATC to reopen CanTung Mine
(125.94 Ko)
Liard East Exploratory Drilling Program - EA00-003 Go to Project
Environmental Assessment (EA) - Complete
Paramount responds to conformity analysis submissions from DIAND, EC and the GWNT.
Pine Point Area Timber Harvest Proposal - EA00-005 Go to Project
Environmental Assessment (EA) - Complete
Minister of INAC addresses Paterson's concerns with the length of the process.
Further information on Patterson that applies to MVEIRB's previous IR.
Prairie Creek Phase II Minerial Exploration Drilling Program - EA01-003 Go to Project
Environmental Assessment (EA) - Complete
Letter regards the schedule for the conformity check and technical analysis of the CZN surface drilling program environmental assessment.
Final EA Work Plans and Terms of Reference
(49.57 Ko)
Conformity and Technical Review
(68.99 Ko)