Main Content
Onglets principaux
Results
Displaying 10376 - 10400 of 12221
Snap Lake Diamond Mine - EA01-004 Go to Project
Environmental Assessment (EA) - Complete
Letter from the Lutsel K'e Dene First Nation regarding their concerns with the environmental assessment of De Beers' proposed Snap Lake Diamond project.
Letter from MWTMN to MVEIRB re: EA concern
(505.2 Ko)
Technical Sessions Notes - Changes
(9.94 Ko)
Letter states that the Yellowknives Dene First Nation Land and Environment Committe will be participating in the Snap Lake public hearings.
Technical Session Notes - Day 5
(118.44 Ko)
Technical Session Notes - Day 1, 2 & 3
(95.49 Ko)
Snap Lake Public Hearing Submission
(228.3 Ko)
CanTung Mine Water License Renewal - EA02-003 Go to Project
Environmental Assessment (EA) - Cancelled
Re: application for a stay of EA
Draft Terms of Reference and Workplan
(1.95 Mo)
Mackenzie River 2D Seismic Program - EA02-002 Go to Project
Environmental Assessment (EA) - Complete
Lorrnel Consultants ask MVEIRB to resend the fax because they did not receive the full document.
DFO calls to support comments by Dr. A. Popper
MEMO from MVEIRB
(72.07 Ko)
Dr. Arthur Popper's comments in response to the draft terms of reference and DFO's comments on the same document.
MVEIRB forwards a copy of DFO and INAC's comments on the draft terms of reference and work plan to the distribution list.
Expert Comments on the Draft Terms of Reference
(343.11 Ko)
INAC's comments on the draft terms of reference for WesternGeco's Mackenzie River Seismic Project
DFO's comments on the draft terms of reference for WesternGeco's Mackenzie River Seismic Program.
DFO Response to WesternGeo's Draft Report
(705.11 Ko)
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
Letter confirms support for the Mackenzie River Bridge project at Fort Providence, NWT, with certain conditions
Mackenzie Gas Project - EA03-007 Go to Project
Environmental Assessment (EA) - Complete
Imperial Oil Ltd. meeting on the draft Work Plan
(277.69 Ko)