Main Content
Onglets principaux
Results
Displaying 7651 - 7675 of 12191
Mineral Exploration Program - EA0506-005 Go to Project
Environmental Assessment (EA) - Cancelled
DFO one page hearing summary
(17.9 Ko)
CVs of Sidon and CGV representatives
(13.9 Ko)
CGV and Sidon Presentation
(487.98 Ko)
1-Page Summary from Treaty 8 Tribal Corporation for CGV and Sidon Public Hearing
1-Page summary from PWNHC
(17.03 Ko)
1-page summary by NSMA
(31.03 Ko)
One-page hearing presentation summary provided by CGV and Sidon
A letter from the Review Board that notes that the Board has passed a motion to combine the hearings for the CGV and Sidon projects. A proposed agenda is also attached to the notification.
EC to present at Public Hearing
(58.27 Ko)
A letter sent to Greg McKillop of Rescan, and copied to the Parties for the CGV assessment. The letter details the possibility of one of the Dogrib language interpreters presenting before the Board.
DFO participation at public hearing
(25.85 Ko)
Mineral Exploration Program - EA0506-006 Go to Project
Environmental Assessment (EA) - Cancelled
Public Hearing Presentation by Treaty 8 Tribal Corporation
Public Hearing Presentation by PWNHC
(3.58 Mo)
Environment Canada Presentation Summary (1-page)
DFO one page hearing summary
(17.91 Ko)
DFO Hearing Presentation
(88.24 Ko)
CVs of Proponent Representatives
(13.83 Ko)
CGV and Sidon Hearing Presentation
(488.05 Ko)
1-Page Summary by Treaty 8 Tribal Corporation for the Sidon/CGV public hearing
1-Page summary by PWHNC
(17.03 Ko)
1-page hearing presentation summaryn provided by CGV and Sidon
1 page summary by NSMA
(31.03 Ko)
A letter from the Review Board that notes that the Board has passed a motion to combine the hearings for the CGV and Sidon projects. A proposed agenda is also attached to the notification.
EC to present at Public Hearing
(58.34 Ko)
DFO participation at public hearings
(20.34 Ko)