Main Content
Onglets principaux
Results
Displaying 7451 - 7475 of 12221
Pine Point Pilot Project - EA0607-002 Go to Project
Environmental Assessment (EA) - Complete
Developer's Presentation at Technical Sessions
(757.02 Ko)
An update from Tamerlane Ventures identifying changes to the power source plans for the PPPP, as of July 12, 2007, indicating a transition to hydro power from the Taltson Dam during the course of operations. Also included is correspondence between the dev
Water related documents for Technical Sessions
(196.15 Ko)
Additional questions for consideration of Technical Experts in preparation for Topic 1 - Water inflows to mine - of the forthcoming Technical Sessions in Hay River on July 17-18.
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
The letter is a response to Deze Energy's Land Use permit application.
Gahcho Kue Diamond Mine - EIR0607-001 Go to Project
Environmental Impact Review (EIR) - Complete
Developer workplan comments
(17.97 Ko)
Developer ToR comments
(96.7 Ko)
DKFN ToR comments
(27 Ko)
YKDFN ToR comments
(171 Ko)
Parks Canada ToR comments
(26.92 Ko)
NRCan ToR comments
(415.96 Ko)
INAC ToR Comments
(476.01 Ko)
Health Canada ToR comments
(33.5 Ko)
GNWT cover letter ToR comments
(43.44 Ko)
GNWT ToR Comments
(43.45 Ko)
Environment Canada ToR comments
(67 Ko)
DFO ToR Comments
(16.31 Ko)
Transpor Canada ToR comments
(557.76 Ko)
e-mail - Response to Message of June 28 2007
(11.29 Ko)
Great Bear Lake Exploration Project - OBD0708-001 Go to Project
Other Board Decision - Complete
MVEIRB July 13 2007 letter to HBR
(99.82 Ko)
DRRC correspondence July 13 07
(30.57 Ko)
Hunter Bay Resources maps
(288.15 Ko)
DRRC letter to Hunter Bay Resources July 9, 2007
(100.15 Ko)
DRRC letter to DLC re: Sloan Drill Target area
(197.31 Ko)