Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
YKDFN Technical Report- Giant EA
(686.75 Ko)
The following document is a May 2005 tabular summary of crown pillar failure risk-ranking.
The following document is a memo from SRK Consulting to the Giant Mine Remediation Project proponent regarding crown pillar stability on the Giant Mine site.
The following document is an independent risk assessment of Giant Mine components related to arsenic trioxide migration for the Giant Mine Remediation Project.
The following document is a Golder assessment on the stability of Stope 2-01 Complex Crown Pillar in relation to the Giant Mine Remediation Project.
The following document is a stability assessment by Golder on Crown Pillar B2-08 in relation to the Giant Mine Remediation Project.
The following document is a memo from Golder for the Giant Mine Remediation Project proponent regarding proposed mitigation for high risk underground workings in relation to the Giant Mine Remediation Project.
The following document is a memo from Golder for the Giant Mine Remediation Project proponent regarding stope stability and surface access.
The following document is a memo from AECOM for the Giant Mine Remediation Project proponent regarding the structural integrity of the Giant-site roaster complex and other buildings.
Resume of K.A. Enns
(44.95 Ko)
This letter reminds parties of upcoming dates and advises them of a change of contact for the week week of July 10th to 13th 2012.
Halocarbon Material Safety Data Sheet
(4.15 Mo)
Halocarbon spill report
(1.72 Mo)
AN e-mail- Halocarbon spill
(56.49 Ko)
Gahcho Kue Diamond Mine - EIR0607-001 Go to Project
Environmental Impact Review (EIR) - Complete
This is a letter from De Beers Canada to the Wildlife Monitoring Plan Working Group regarding meeting times and activities.
This is a letter from Transport Canada regarding discussions on second round information requests with De Beers Canada.
NICO Project - EA0809-004 Go to Project
Environmental Assessment (EA) - Complete
NICO Project public hearings postponed
(259.78 Ko)
This is a letter from the Tlicho Government to the Review Board regarding hearing dates and locations.
This is the cover letter submitted by Fortune Minerals for the updated commitments table and responses to Techncial Reports.
Updated Commitments Table
(886.35 Ko)
Responses to parties' Technical Reports
(214.97 Ko)
This is a letter and technical memorandum from Fortune Minerals regarding an Update of Receiving Water Quality and Source Loading Predictions for the Operations Period with Revised Winter Dust Emission Assumptions.
This is a news release submitted by Fortune Minerals Limited that announces a FEED Study and new mineral reserves.
Nechalacho Rare Earth Element Project - EA1011-001 Go to Project
Environmental Assessment (EA) - Complete
The following document is a Note-to-File for the environmental assessment of Avalon Rare Metals Inc.'s Thor Lake Rare Earth Element Project, regarding the Review Board's scheduling of the August 2012 technical session.
Yellowknife Gold Project (2008) - EA0809-003 Go to Project
Environmental Assessment (EA) - Ongoing
Note to File- change in EAO
(59.13 Ko)